SootSpec
Service 03

Moisture protection and drying

After a fire, the firefighting water is often a bigger problem than the fire itself. We start drying on day one and prove the result with measurements, not with a guess.

Available separatelyPart of full restoration

When you need it

  • Firefighting water has soaked floors, walls or insulation
  • Water damage from a leak, burst pipe or flood
  • Before a contractor closes walls or lays new flooring

Why it matters

Mould behind new surfaces

Closing a wall or laying a floor over a structure that is still wet is the classic route to mould and odour a few months later.

Winter changes the physics

Condensing dehumidifiers lose much of their capacity in cold rooms. In the Nordic winter we combine heating with desiccant drying.

Proof matters

A daily drying log shows the insurer and the next contractor exactly when the structure reached safe values.

Our procedure

What a drying log looks like

EXAMPLE DRYING LOG · ILLUSTRATIVE HighLow Day 1Day 5Day 9Day 13 Readings at the same fixed measuring points every day Target value (material / manufacturer) Floor slabWall basePartition OK to close up

Illustration of a daily drying log. Real logs use your measuring points and the target values for your materials.

Equipment

  • Pin and pinless moisture meters
  • RH probes for concrete
  • Thermo-hygrometers and data logging
  • Condensing and desiccant dehumidifiers
  • Air movers and heaters
  • Thermal camera

What you receive

  • Moisture map with measuring points
  • Daily drying log
  • Final readings and sign-off for closing

Order it on its own

For contractors and property managers: Drying-only is one of our most common standalone jobs: we dry and document, you rebuild on a structure you know is ready.

Questions

How long does drying take?

It depends on the material, the amount of water and the season. Concrete can take weeks; lightweight structures often days. The daily log shows the progress.

Can we just open the windows?

In the Estonian autumn and winter, outdoor air often carries more moisture into the building than it removes. Controlled drying is faster and measurable.

Do you leave the equipment running unattended?

Yes, with safe placement and regular checks. Every visit is logged.

Tell us what happened.

Send us photos and the address. We confirm the scope, the price basis and the start date before anyone goes on site.