SootSpec
Service 04

Containment and selective demolition

Contamination stays where it is. We separate the work area into zones, keep it under negative pressure and remove only what cannot be saved, from the top down.

Available separatelyPart of full restoration

When you need it

  • Ceilings, insulation, boards or cabinets are charred or soaked
  • Work must happen while the rest of the building is in use
  • Neighbours, a stairwell or common areas must be protected

Why it matters

Demolition spreads soot

Breaking out burned material releases fine soot and dust. Without containment it ends up in clean rooms and other apartments.

Asbestos comes first

Older buildings can contain asbestos. Nothing is demolished before that question is answered.

Keep the evidence

Items the insurer may want to inspect are photographed and kept, not thrown in the skip.

Our procedure

Set three zones

Dirty, transition and clean zones, separated by poly zip-walls.

Negative air

HEPA air units exhaust filtered air outside, so air flows into the work zone and not out of it.

Decontamination

PPE is changed and tack mats are used at every exit.

Asbestos checked

Survey result or written confirmation before demolition. Asbestos removal only by licensed contractors.

Top-to-bottom removal

Unsalvageable ceilings, insulation, boards, cabinets and floor coverings come out from the top down.

Vacuum every cavity

Each opened cavity is HEPA-vacuumed straight away.

Waste out by one route

Waste is bagged where it is removed and leaves the building along one protected route.

How a site is zoned

DIRTY ZONE Burn area · demolition · cleaning poly zip-wall TRANSITION PPE change decontamination tack mat CLEAN ZONE Protected rooms, stairwell, neighbours Entry from stairwell → HEPA neg. air unit window filtered exhaust out air flows clean → dirty bagged waste, one route

Equipment

  • HEPA negative air units with ducting
  • Poly zip-walls, tack mats
  • H-class HEPA vacuums
  • Demolition tools with dust extraction
  • Sealed waste bags and containers

What you receive

  • Photos before and after removal
  • List of removed materials
  • Waste and disposal records

Order it on its own

For contractors and property managers: Need a clean strip-out before your crew starts the rebuild? We do the containment and removal and hand over an empty, vacuumed, documented structure.

Questions

Can people keep living in the rest of the building?

Usually yes. That is exactly what the zoning and negative air are for.

Do you remove asbestos?

No. Asbestos removal is done by licensed contractors. We make sure it is checked and handled before we demolish anything.

Where does the waste go?

Sorted and delivered to licensed waste handlers. You receive the disposal records.

Tell us what happened.

Send us photos and the address. We confirm the scope, the price basis and the start date before anyone goes on site.